Experience and responsibility are the foundation of reliability

Error message

  • Notice: Undefined variable: node in include() (line 35 of /var/www/basisj/basis.org.ua/sites/all/themes/ubc_omega/region--branding.tpl.php).
  • Notice: Trying to get property 'path' of non-object in include() (line 35 of /var/www/basisj/basis.org.ua/sites/all/themes/ubc_omega/region--branding.tpl.php).
  • Notice: Undefined variable: node in include() (line 35 of /var/www/basisj/basis.org.ua/sites/all/themes/ubc_omega/region--branding.tpl.php).
  • Notice: Trying to get property 'nid' of non-object in include() (line 35 of /var/www/basisj/basis.org.ua/sites/all/themes/ubc_omega/region--branding.tpl.php).

Reconstruction and comprehensive development of Illich Avenue in Donetsk

English
Address: 
Donetsk, Voroshylov district, Illich avenue (the plot between Lenin Square and Constitution Square)
Client: 
Donetsk city council
General contractor: 
LLC "Ukrbuilding Corporation"
Term of start / finish of construction: 
2011

Principal building performances:

• Hard-surface pavement area – 10940 sq.m.

• Sidewalk area – 11600 sq.m.

• Green spaces area – 6598 sq.m.

General building specifications:

As part of the reconstruction project, the rebuilding of the stone-block pavement was finished with the complete replacement of the underlying layer of sand and the use of own paving stones. Two thousand square meters of material unsuitable for reuse were replaced.
 
Parking and retaining walls were installed manually for multilevel coating of FEM sidewalks too.
 
On the roadway of the avenue, the slope was reduced by retaining walls and monolithic steps, and the asphalt paving was replaced with FEM paving.
 
In the process of reconstruction, the existing supports of the lighting and contact network were replaced, and park lighting was installed.
 
Throughout the site, there are mini-recreation areas, as well as a separate sidewalk for people with disabilities.